Billings Police Department Evidence Building Addition

Project Overview

Location: Billings, MT
Size: 14,600 sf - Addition 7,265 sf - Remodel Completion: Fall 2020

Project Description

This project re-purposed the 7,265 sf existing evidence facility for less technical functions, allowing the high security and environmentally sensitive spaces into the new 14,600 sf addition. The facility is developed to meet the growth projections for the next 10 years; plus be able to add onto all areas to plan for the next 20 years. Total project costs were developed including building construction costs and soft costs such as surveys, soil tests, fees and loose furnishings.

Additional Photos

Yellowstone County Jail Addition

Project Overview

Location: Billings, MT
Size:26,290 sf New Housing- Addition
9,100 sf Kitchen and Laundry Remodel and Storage Addition Cost: $11.8m
Completion: Fall 2019

Project Description

Due to overuse and failing security electronic components, SFA team provide a detailed on -site review of the system in this 286-bed facility, built in 1986.

Our challenge was to provide required security with minimum downtime for system switch over. Main control and secondary max control were tied together to allow takeover of the entire system by either control room if the need occurred.

To be sensitive to cost our detailed inventory allowed us to select some devices or systems to remain with an easy change-out should a failure occur.

Both control stations were completely gutted, and this could on happen after infrastructure was all in place and proper take-over by the second station had occurred. The project was completed with out incident.

Additional Photos

public safety center

Project Overview

Location: Dickinson, ND
Size: 42,500 sf
Cost: $12.7m
Completion: Fall 2015

Project Description

With the expanding oil exploration occurring around Dickinson, North Dakota, the City of Dickinson has built a new 42,500 sf. Public Safety Facility to be the new headquarters for their Police and Fire Departments.

The site location is a 9 acre, south facing hillside on the city’s western edge. The site and building orientation was designed to take advantage of solar exposures, wind direction and natural site drainage. The City of Dickinson required the facility to exceed normal standards for energy, water conservation, and pollution prevention. The natural ventilation for an improved working environment, along with integrated system designs for passive heating and cooling, day-lighting, safety and other energy conservation features and technologies were highly desired.

Additional Photos

Campbell County Courthouse

Project Overview

Size: 60,000 sf - New
40,000 sf - Remodel
Cost:$10.6m
Completion: 2006
Reference: Matt Zahn, Campbell County Public Works

Project Description

Prior to design of this expansion to the Campbell County Courthouse, Schutz Foss Architects used a space planning study including each department and included unallocated space for future growth needs.

This remodel and addition consolidated offices county wide. The existing courtroom was updated. New courtrooms and county offices were added along with Judges Chambers, County Commissioner Offices, courtroom auxiliary space and holding rooms.

Additional Photos

Career Opportunities

Looking for an exciting career with an award-winning firm? Schutz Foss is always looking for the best talent around. Please click below to find out our current position openings.

Contact Information

Billings, Montana

3030 4th Avenue North
Billings, MT 59101
(406) 252-9218

Gillette, Wyoming

107 East 1st Street
Gillette, WY 82716
(307) 685-0209